Sunshine Portal · Section
PO 0000027207
Ofc of the State Engineer
PO Details
- PO ID
- 0000027207
- PO Date
- 07-08-2026
- Agency
- Ofc of the State Engineer
- Vendor
- WAGNER EQUIPMENT COMPANY
- Contract ID
- 40000002300045AF
- Division
- 21400
- Vendor ID
- 0000045306
- PO Status
- Dispatched
- Buyer
- STEVEN.BAR
- Origin
- CON
- Cancel Status
- Approved
- PO Amount
- $990.00
Division, PO Status, Origin, and Cancel Status are derived from positional fields in the SHARE PO_EXTRACT file. PO Status (D → Dispatched,C → Cancelled) and Cancel Status (A → Approved, C → Cancelled) translations are inferred from the live Sunshine Portal screens and remain pending DOIT confirmation.
Line Items
9 line items on this purchase order.
| Line Item | Category | Description | Date | Total Amount | Amount Expended | Balance |
|---|---|---|---|---|---|---|
| 1 | Maint - Furn, Fixt, Equipment | Maintenance PM1 Preventative 2 @ $495 each | 07-08-2026 | $990.00 | $0.00 | $990.00 |
| 2 | Maint - Furn, Fixt, Equipment | Maintenance PM2 6-Year Preventative | 07-08-2026 | $1,354.00 | $0.00 | $1,354.00 |
| 3 | Maint - Furn, Fixt, Equipment | Load Bank Test Annual 2 @ $750.00 | 07-08-2026 | $1,500.00 | $0.00 | $1,500.00 |
| 4 | Maint - Furn, Fixt, Equipment | Engine Oil Analysis and Coolant Basic | 07-08-2026 | $100.00 | $0.00 | $100.00 |
| 5 | Maint - Furn, Fixt, Equipment | Engineer Field Labor Segment 1, 2 Hours2 @ $166 each | 07-08-2026 | $332.00 | $0.00 | $332.00 |
| 6 | Maint - Furn, Fixt, Equipment | Exhaust Pipe | 07-08-2026 | $18.17 | $0.00 | $18.17 |
| 7 | Maint - Furn, Fixt, Equipment | Engineer Field Labor Segment 2, 2 Hours2 @ $166 each | 07-08-2026 | $332.00 | $0.00 | $332.00 |
| 8 | Maint - Furn, Fixt, Equipment | Spark Plugs | 07-08-2026 | $150.00 | $0.00 | $150.00 |
| 9 | Maint - Furn, Fixt, Equipment | Engineer Field Labor Segment 3, Troubleshoot Engine and Timing Issue 2 Hours2 @ $166 each | 07-08-2026 | $332.00 | $0.00 | $332.00 |
Showing 1 to 9 of 9 entries
← PrevPage 1 / 1Next →